ASU Now - Student Pavilion
DownloadTEMPE - Aug. 31, 2017 - ASU Now - Student Pavilion - The official signs aren't yet up in the new Student Pavilion building across from the Memorial Union on the Tempe Campus, on Thursday, August 31, 2017. The 74,653 square-foot structure provides students with two new classrooms, plenty of study and social spaces and offices for student groups. The goal for the Student Pavilion is to be a Net Zero Energy building designed to meet the University's goals for Climate Net Neutrality and sustainable building systems. It is designed to meet specifications for LEED certification. Photo by Charlie Leight/ASU Now
- Filename
- 20170831StudentPavilionBuilding_01.JPG
- Copyright
- Copyright Arizona Board of Regents
- Image Size
- 6469x4313 / 16.3MB
- Contained in galleries
- Tempe - Student Pavilion