20110920 - ISTB4 Construction - Tempe
Download
20110920 - ISTB4 Construction - Tempe
Image is not released.
Construction continues on the Interdisciplinary Science and Technology Building 4 (ISTB4) on the Tempe campus on Sept. 20, 2011. Construction is scheduled for completion in May 2012. The building will provide flexible laboratories with adjoining workspace for the School of Earth and Space Exploration, the College of Liberal Arts and Sciences, and Fulton School of Engineering research programs including Environmental Engineering and Energy Research Initiatives. On the ground floor, a 250-seat auditorium and gallery area will serve as university classrooms as well as an outreach function for both K-12 educational programs and public events. (Tom Story/Arizona State University)
- Filename
- 20110920 ISTBConstruction_2.JPG
- Copyright
- Tom Story
- Image Size
- 3504x2336 / 6.1MB
- asunews.asu.edu
- Contained in galleries
- 20091120 ISTB4 Construction